Brand Logo
  • Home
  • Products
  • How It Works
  • Applications
  • Savings Guide
  • Contact
Plan My System

Terms of Service

These terms describe how visitors may use the Growatt website, request information, and communicate with our project guidance team. Website content is provided for general product and planning education. It does not replace local electrical design, permitting review, utility interconnection approval, tax advice, or field inspection by qualified professionals.

Product information

Specifications, compatibility notes, warranty references, and regional compliance statements may vary by model, market, firmware, and installation condition. Before purchasing or installing solar inverters, batteries, EV chargers, charge controllers, solar kits, or BOS components, confirm the current datasheet and local code requirements with an authorized channel.

Requests and communication

Submitting a form does not create a purchase contract or guarantee product availability. Growatt may respond with clarifying questions about load profile, country, voltage, battery type, roof layout, and monitoring needs to help route the inquiry responsibly.

Responsible use

Do not misuse website forms, attempt unauthorized access, submit misleading project information, or rely on generalized savings examples as guaranteed financial outcomes. Energy savings depend on site conditions, tariffs, incentives, usage behavior, and installation quality.

Ready to size a practical solar and storage system?

Share a bill profile, inverter target, or battery backup goal and Growatt will help map the next step.

Request Guidance
Growatt

Solar inverters, batteries, portable power, and installer support for homes and light commercial projects that need clear answers before hardware ships.

LinkedIn YouTube Support
Products
Hybrid Inverters Battery Storage Solar Kits Portable Power
Solutions
How It Works Residential Solar Off-Grid Cabins Savings Guide
Resources
Blog Installer Support Manual Requests Contact
Company
About Growatt Terms of Service Privacy Policy

UL 1741 SA ready | IEC 62109 aligned | CE marked | ISO 9001 quality systems

(c) 2026 Growatt. All rights reserved. Regional availability, incentives, and warranty terms vary by installation site.
Request Growatt System Guidance